Installation testing

Results: 155



#Item
101Safety / Safety equipment / Fire extinguisher / Wildland fire suppression / Hydrostatic test / Gaseous fire suppression / Fire protection / Fire retardant / Read and Campbell Limited / Firefighting / Active fire protection / Fire suppression

RULES AND REGULATIONS FOR INSTALLATION, INSPECTION, RECHARGING, REPAIRING, SERVICING AND TESTING OF PORTABLE FIRE EXTINGUISHERS OR FIRE SUPPRESSION SYSTEMS CHAPTER[removed]TABLE OF CONTENTS

Add to Reading List

Source URL: www.gainsurance.org

Language: English - Date: 2010-06-10 12:28:01
102Pavel Vinogradov / International Space Station / Countdown / Valeri Tokarev / Quest Joint Airlock / Space Shuttle program / Expedition 13 / STS-132 / Spaceflight / Human spaceflight / Manned spacecraft

April 4, 2006 www.nasa.gov Shuttle arm returns, to undergo testing before installation

Add to Reading List

Source URL: www.nasa.gov

Language: English - Date: 2013-06-26 22:04:50
103Time to digital converter / Crate / Technology / Collider Detector at Fermilab / Electronic engineering

Testing, Installation and Analysis of the TDC (Time to Digital Converter) Modules to be used in the CDF-COT detector.

Add to Reading List

Source URL: sist.fnal.gov

Language: English - Date: 2000-08-08 11:05:32
104Piping / Fluid mechanics / Petroleum production / Pressure measurement / Underwater diving / Pressure vessel / Leak / Oil well / Hydrostatic test / Technology / Water / Plumbing

Rules for the Installation, Inspection & Testing of Air Reservoirs (PDF)

Add to Reading List

Source URL: tc.gc.ca

Language: English - Date: 2008-12-05 13:59:26
105Technology / Local loop / Electronics / Competitive local exchange carrier / Incumbent local exchange carrier / Local exchange carrier / Local number portability / Integrated Services Digital Network / Demarcation point / Electronic engineering / Telecommunications companies / Telephony

ITMGV3-0.doc Installation, Testing and Maintenance Guidelines for Unbundled Loops Issue Date: March 17, 2004 Effective Date: To be Determined

Add to Reading List

Source URL: www.crtc.gc.ca

Language: English - Date: 2004-06-07 15:02:55
106Technology / Local loop / Electronics / Competitive local exchange carrier / Incumbent local exchange carrier / Local exchange carrier / Local number portability / Demarcation point / Integrated Services Digital Network / Electronic engineering / Telephony / Telecommunications companies

Installation, Testing and Maintenance Guidelines for Unbundled Loops Issue Date: June 9, 2006 Effective Date: September 1, 2006

Add to Reading List

Source URL: www.crtc.gc.ca

Language: English - Date: 2007-04-11 15:30:46
107Telephony / Electronics / Local loop / Competitive local exchange carrier / Incumbent local exchange carrier / Digital subscriber line / Local exchange carrier / Integrated Services Digital Network / Local number portability / Electronic engineering / Technology / Telecommunications companies

Installation, Testing and Maintenance Guidelines for Unbundled Loops Issue Date: November 18, 2005 Effective Date: January 23, 2006

Add to Reading List

Source URL: www.crtc.gc.ca

Language: English - Date: 2007-04-11 15:30:37
108Technology / Local loop / Electronics / Competitive local exchange carrier / Incumbent local exchange carrier / Local number portability / Local exchange carrier / Integrated Services Digital Network / Demarcation point / Electronic engineering / Telephony / Telecommunications companies

ITMGV2-0.doc Installation, Testing and Maintenance Guidelines for Unbundled Loops Issue Date: March 18, 2002 Effective Date: To be Determined

Add to Reading List

Source URL: www.crtc.gc.ca

Language: English - Date: 2002-08-13 10:48:23
109Building engineering / Matter / Construction / Building biology / Radon mitigation / Slide / Soil vapor extraction / Floor / Basement / Radon / Architecture / Soil contamination

MITIGATION • Methods of mitigation • Design and installation • Post-mitigation or confirmation testing • Radon systems • Community outreach

Add to Reading List

Source URL: www.health.ny.gov

Language: English - Date: 2006-10-30 11:56:45
110Science / Technology / Underwater diving / Ultrasound / Hyperbaric welding / Ultrasonic testing / Gas tungsten arc welding / Inspection / Corrosion / Welding / Evaluation / Nondestructive testing

UNDERWATER MAINTENANCE AND REPAIR IN LIEU OF DRY DOCKING USS MIDWAY Museum Installation of Hull Suction and Discharge Blank Patches

Add to Reading List

Source URL: www.hnsa.org

Language: English - Date: 2011-01-02 20:30:24
UPDATE